Lower Level Work
The drywall is up in the "Great room". That is the area in the lower level that is directly uder the living room. I did not finish the mudding or sanding. But the hardest part is done. I foung that I can install Drywall by myself, all it takes is to rent a Drywall lift from the local Ace Hardware Rental center and a 2 by 4.




If you look on the fireplace mantel, you will see that paint samples. The concrete block wall next to the fireplace is going to be tiled. And if you look at the top 2 photos you see the lake through the windows.
Once all the mudding is done and the ceiling is painted, I will adjust the lights.
Joe




If you look on the fireplace mantel, you will see that paint samples. The concrete block wall next to the fireplace is going to be tiled. And if you look at the top 2 photos you see the lake through the windows.
Once all the mudding is done and the ceiling is painted, I will adjust the lights.
Joe

I trust you'll get that new window stained to match the color of the other one exactly. I was so hoping to see the pocket French Doors to the bedroom. Guess I'll have to wait until Spring.