Extreme bathroom makeover day 1



As you can see the plaster has been removed. Thanks Lou!

We started at about 9:00am. By 10:aam we had the 2 ton bath tub removed. By 11:30am we had 2 out of the 4 walls plaster removed. That is when we head to Home Depot to pick up the tub and for a Lunch break.

We got back home at 2:30pm. By 4 PM we had all the walls and ceiling down.

Today I am doing the electric and plumbing.